Lenss to decide build vs buy
Price the build honestly before you cancel the vendor.
Build versus buy memos, checked for the total cost of owning the thing you build: people, upkeep, compute and egress.
Works on: Build vs buy memos · Vendor replacement proposals · Platform investment cases
How the audit runs
01
Pin the decision criterion
Cost, control or capability: what the memo says decides it.
02
Quote the cost the memo leaves out
Maintenance, on-call, security patching and egress, where the memo mentions them or implies they are zero.
03
Rebuild total cost of ownership
Both options on the same basis, from the memo's own figures.
04
Compute the volume threshold
The usage at which building starts to pay.
Typical findings
Engineers priced at zero
Upkeep the team already pays for on similar systems, left out of the build case.
Today's volume, tomorrow's price
Vendor costs projected at a growth rate the build case ignores.
Hidden infrastructure
Egress, storage and redundancy the vendor was absorbing.
Worked example
The same draft, read by a standard AI assistant and by Lenss. Every figure is computed from the draft.
Source draft
Memo: replace the hosted search vendor
Pinned objective
Cut search cost without losing reliability.
Hidden assumption
That upkeep is minimal. The team's own comparable cluster took 1.5 engineers last year.
“Upkeep should be minimal once it is running.”
If it’s wrong: Priced like the logging cluster, building costs $381,360 a year: $117,360 more than the vendor, not $184,800 less.
Flip threshold
Monthly query volume at which building pays
≥ 59.6M queries/mo draft states 40M
- Vendor at 40M queries/mo
- $264,000/yr
- Build: compute
- $79,200/yr
- Build: 1.5 engineers of upkeep
- $300,000/yr
- Build: egress
- $2,160/yr
- Build: total
- $381,360/yr
At 40M queries a month, keep the vendor. Revisit once volume passes about 60M, or if upkeep can be shown to be under 0.9 engineers.
Cheapest test: Ask the logging cluster's owners for last year's on-call and upgrade hours, and price the build with them.
Used most by Engineers
Audit your own draft now.
Paste up to 24,000 characters. You get the objective, every quoted assumption, the tensions, the flip threshold and a hardened rewrite.